High Speed planning in Poland. Preparation and implementation of high speed lines build Sebastian Mech Praha, 14 November 2007 Preparation and implementation of high speed lines network build Why do we need high speed lines? distances between biggest cities in Poland are more than 300 km speed of 160 km/h is not sufficient in competition with road transport, taking into consideration present and future building of motorways and expressways a chance to be in competition with short-distance airlines, which are still developing 2 1
Preparation and implementation of high speed lines network build Modernisation Plans according to Operational Programme for years 2007-2013 For preparation and implementation of railway projects assumed total amount about 6 billions. The most of them concern modernisation of AGC/AGTC lines. There are also foreseen two projects for preparation of high speed lines. 1. Connection of Warsaw Katowice/Krakow 2. Connection of Warsaw Lodz Wroclaw/Poznan 3 Preparation and implementation of high speed lines network build GDYNIA Railway lines network in Poland. Modernisation plans. SŁUPSK GDAŃSK ELBL ĄG KOSZALIN OLSZTYN SZCZECIN BYDGOSZCZ BIAŁYSTOK TORUŃ GORZÓW WLKP. PŁOC K POZNAŃ ZIELONA GÓRA KALISZ LEGNICA RADOM LU BLIN CZĘSTOCHOWA OPOLE KI E LCE WA ŁBRZYCH KATOWICE GLIWICE RYB NIK KRAKÓW TA RNÓW RZESZÓW BIELSKO BIAŁA Modernisation foreseen in Operational Programme 2007 2013 Modernisation after year 2013 High speed lines: Building new line speed 300/350 km/h (after 2013) Modernisation of existing line to max speed 250km/h (before 2013) 4 2
Preparation and implementation of high speed lines network build High speed lines and conventional railway system Implementation of high speed lines and modernisation projects have to take into consideration cooperation two railway systems (conventional and high speed) and complementary each other. Main assumptions for modernisation and development of railway system in Poland The programme accepted in PKP PLK S.A. shows target speeds at lines and also high speed lines. 5 Preparation and implementation of high speed lines network build High speed lines and conventional railway system GDY NIA SŁ UPS K GDAŃSK ELBLĄG KOSZALIN SZCZE CIN GRUDZIĄDZ OLSZTYN Target speeds on lines GORZÓW WLKP. POZNAŃ ZI ELONA GÓR A BYDGOSZCZ TOR UŃ WŁOCŁAWEK PŁOCK KALISZ BI AŁYSTOK 200 < v 350 160 < v 200 120 < v 160 v = 120 v < 120 LEGN ICA RADO M LUBLIN CZ ĘSTOC HO WA WAŁBRZYCH OPOLE KIE LC E GLIWICE RYB NI K KATOWICE KRAKÓW BIE LSKO BIA ŁA TARNÓW RZESZÓW 6 3
Preparation and implementation of high speed lines network build A localisation of high speed lines is not accidental. These lines are forming up a kind of backbone of railway system. 7 Preparation and implementation of high speed lines network build High speed line as a backbone of railway system. GDYNIA SŁ UPSK GDAŃSK ELBLĄG KOSZALIN Vilnius Riga SZCZECIN GRUDZIĄ DZ OLSZTYN High speed lines GORZÓW WLKP. BY DGO SZ CZ TOR UŃ BI AŁYSTOK Berlin ZIELONA GÓRA POZNAŃ WŁOCŁAWEK PŁOCK WA RS ZA WA KALISZ Minsk Moskov Connections with HS lines Dresden LE GN ICA WAŁB RZYCH OPO LE CZĘSTOCHOWA KIE LCE RA DOM LUBLIN Kiev AGC/AGTS lines Praha GLIWICE RYB NI K Praha Wien Bratislava Budapest KATOWIC E BI ELS KO BI AŁA KRAKÓW T ARN ÓW Kosice Bucuresti RZES ZÓW Lw ow Odessa 8 4
Preparation and implementation of high speed lines network build Planed stages of preparation and implementation of high speed lines 1. Connection Warsaw Katowice/Krakow 2. Connection Warsaw Lodz Wroclaw/Poznan 9 Preparation and implementation of high speed lines network build 1. Connection Warsaw Katowice/Krakow Modernisation and extension of the central main line A contract for carrying out feasibility study, design and tender documentation for this project should be signed in the next year. Preparing of whole necessary documentation is expected until 2010/2011. In the feasibility study should be analysed following general options: - modernisation up to 200/220 km/h - modernisation and building line up to 250/270 km/h - modernisation and building line up to 300/350 km/h - reference option (do nothing). 10 5
Preparation and implementation of high speed lines network build Main tasks and stages Task 2 Zawiercie - Katowice CZECH REPUBLIC Zebrzydowice Ta sk 4 Katowice Zebrzydowice/Zwardon Task 1 Grodzi sk - Zawier cie ZAWIERCIE KATOWICE Zwar don SLOVAKIA Ps ary KRAKÓW Grodzisk Maz. Ta sk 3 Psary - Krakow Task 1 - modernisation up to 250 km/h implementation of work 2011-2013 Task 2 building new section with speed 250/300 km/h implementation of work 2012-2014 Task 3 modernisation and build new section with speedup to 200/250km/h implementation of work 2012-2014 Task 4 modernisation/rebuild up to 160/200 km/h implementation of work 2013-2015 11 Preparation and implementation of high speed lines network build 2. Connection Warsaw Lodz - Wroclaw/Poznan Building of new line, so-called Y line The call for tender for preparation of feasibility study for this project is foreseen in the next year. A chosen Consultant should make proper financial and technical analysis, taking into consideration possible sources of financing like European funds, state budget and private capital. A getting of financing for this project may be a crucial element enables its implementation on assumed schedule.. 12 6
Preparation and implementation of high speed lines network build 2. Connection Warsaw Lodz - Wroclaw/Poznan Building of new line, so-called Y line Additionally it is assumed directly connection of this project with two other projects concerning modernisation of existing lines. The first of them is modernisation up to 160km/h of line Warsaw Lodz, which is being under implementation. The second one is modernisation of line Lodz Kalisz (up to 120/140 km/h), which is foreseen to implementation in years 2012 2014. These. two modernisations are treated as a stage 0 in point of view implementation of high speed line. 13 Preparation and implementation of high speed lines network build Stages of implementation of Y line INO Stage 0 (Separate project - under implementation) Modernisation of line Warszawa - Łód ź up to v = 160 km/h POZNAŃ LE SZ NO Stage 2A GN IE ZN O WR ZEŚNIA KALISZ OSTRÓW WLKP. KONIN Stage 1B SIERADZ Stage 0 Stage 2B ZDUŃSKA WOLA ŁOWICZ SKIERNIEWICE Koluszki Stage 4 Stage 0 RADOM Stage 0 (separate project) Modernisation of line Łódź - Kalisz up to speed v = 120/140 km/h OL EŚNICA Stage 1A KLUCZBORK CZ ĘSTOC HOWA PIOTRKÓW TRYB. Central Main Line Opoczno OP OLE Psary 14 7
POZNAŃ LE SZ NO OL EŚNICA Preparation and implementation of high speed lines network build GN IE ZN O Stage 2A OSTRÓW WLKP. OP OLE WR ZEŚNIA KALISZ Stage 1A KLUCZBORK KONIN INO SIERADZ Stages of implementation of Y line Stage 1B Stage 0 ZDUŃSKA WOLA CZ ĘSTOC HOWA Stage 2B PIOTRKÓW TRYB. ŁOWICZ Koluszki Central Main Line Psary SKIERNIEWICE Stage 4 Stage 0 Opoczno RADOM Stage 1A Building new line section Wrocław - Kalisz length: 130 km; v = 300 km/h Stage 1B Building new line section Kalisz - Łódź length: 95 km; v = 300 km/h Stage 2A Building new line section Poznań - Kalisz length: 120 km; v = 300 km/h Stage 2B Building new line passing through Łódź node Stage 3 Building new line section Łódź - Warszawa length: 130 km ; v = 300 km/h Stage 4 - Connection the Y line with CML Modernisation of line Łódź - Opoczno length: 65 km; v = 160 km/h 15 8