Development of SHP locations in Poland

Wielkość: px
Rozpocząć pokaz od strony:

Download "Development of SHP locations in Poland"

Transkrypt

1 Development of SHP locations in Poland Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Project Meeting, 3rd October 2013 Kraków

2 Hydropower potential utilisation

3 History of hydropower in Poland

4 Investment process - permits A permission from a river manager/a tender for weir lease/an agreement for lease A decision on environmental considerations of permission of a project completion (environmetal impact assessment) A zoning decision in case of lack of a zoning plan An agreement on terms and conditions of grid connection A use of water permission for building a water installation and for use of water for the purpose of energy generation A tenancy agreement for lands covered with running water (always being State property) A building permission A concession for energy generation

5 Energy Policy in Poland NATIONAL ACTION PLAN AS REGARDS RENEVABLE ENERGY SOURCES Supplement to the National Action Plan from 2nd December, 2011, p. 1 and 2 The Energy Policy defines main aims in the area of the development of RES, which include: ( ) Utilisation for electrictity generation of existing damming facilities being the property of the State The Policy, apart from aims, specifies the actions to be implemented, which include: ( ) The evaluation of possibilities of utilisation for electrictity generation of existing damming facilities being the property of the State, by their inventory, framework environmental assesment and elaborating the rules of giving access to them to investors..

6 Damming facilities National Water Management inventory Damming facilities being the property of the State, inventoried by the National Water Management (with head over 0,7 m)* SHPPs by the inventoried facilities* 651 The degree of hydropower utilisation of the inventoried facilities 4,5% *źródło: Prezentacja pt. Inwentaryzacja stopni piętrzących, M. Kowalczyk, KZGW, Konferencja Dziś i jutro energetyki wodnej w Polsce i UE, Renexpo, Warszawa,

7 Problems Problems: 1. There is no public access to the inventory of damming facilities made by the National Water Management; 2. Unregulated legal status of properties (dams, weirs); 3. Lack of effective regulations giving access to the properties to investors.

8 No public acces to the inventory of the damming facilities *źródło: Prezentacja pt. Inwentaryzacja stopni piętrzących, M. Kowalczyk, KZGW, Konferencja Dziś i jutro energetyki wodnej w Polsce i UE, Renexpo, Warszawa,

9 No public acces to the inventory of the damming facilities *źródło: Prezentacja pt. Inwentaryzacja stopni piętrzących, M. Kowalczyk, KZGW, Konferencja Dziś i jutro energetyki wodnej w Polsce i UE, Renexpo, Warszawa,

10 RESTOR Hydro project UNLEASH MICROHYDRO POTENTIAL IN EUROPE

11 RESTOR Hydro project RESTOR Hydro Map sites in Europe, including: sites in Poland (by 2015) sites at present

12 RESTOR Hydro project Publicly available at:

13 Legal status of properties *źródło: Prezentacja pt. Inwentaryzacja stopni piętrzących, M. Kowalczyk, KZGW, Konferencja Dziś i jutro energetyki wodnej w Polsce i UE, Renexpo, Warszawa,

14 Regulations giving access to properties

15 Draft regulations affecting hydropower Fees for water usage for hydropower purposes So far there are only fees for the use of lands covered with water. These fees depend on income generated from energy production in a hydropower plant. New regulations are planned to introduce fees for water usage depending on discharge (not related to head), which is very unjust for low head schemes. Conditions of water usage in water regions Documents under preparation by water authorities defining very detailed conditions of water usage in each region as a consequence of WFD implementation. The documents will introduce: -revision of permits in force and obligating SHP operators to build fish-passes and other mitigation measures, - minimal flow regulations - no-go rivers, etc. Masterplans the list of all investment projects, which are planned by 2021 and which can affectt the status of water and realisation of environmental objectives for water bodies.

16 Draft regulations affecting hydropower RZGW i regiony wodne

17 Draft regulations affecting hydropower RZGW Kraków Region wodny Górnej Wisły 1. Dwie kategorie rzek z punktu widzenia zachowania ciągłości morfologicznej (szczególnie istotne (wykaz) i pozostałe cieki lub ich odcinki). 2. Na rzekach szczególnie istotnych przepławki dla jesiotra lub łososia (wykaz). 3. Na pozostałych ciekach przepławki dla certy i węgorza. 4. W przypadku obu kategorii rzek wydanie pozwolenia wodnoprawnego na wykonanie obiektu energetyki wodnej jest możliwe pod warunkiem wyposażenia go w urządzenia eliminujące śmiertelność organizmów, a na wykonanie budowli piętrzącej urządzenia zapewniającego migrację. 5. Brak zapisów na temat terminów wyposażania istniejących obiektów w przepławki i urządzenia eliminujące śmiertelność organizmów. 6. Ograniczenia w nowej zabudowie hydrotechnicznej: a. na wszystkich ciekach nowe budowle piętrzące nie mogą w powiązaniu z już istniejącymi powodować zmiany naturalnego reżimu hydrologicznego ani negatywnych oddziaływań na ciągłość morfologiczną w jakiejkolwiek jednolitej części wód powierzchniowych; b. zmiany będące wynikiem nowych działań nie mogą negatywnie oddziaływać na cele środowiskowe żadnej jednolitej części wód powierzchniowych. 7. Minimalny przepływ nienaruszalny = (SNQ ) x k, gdzie k = od 0,50 do 1,52 w zależności od powierzchni zlewni i typu hydrologicznego rzeki (od nizinnego do górskiego). 8. Priorytet (jeden): Pobór wody z przeznaczeniem do spożycia przez ludzi przy uwzględnieniu potrzeb wodnych ekosystemów wodnych i od wód zależnych.

18 Draft regulations affecting hydropower RZGW Kraków Region wodny Górnej Wisły

19 Current situation of Renewable Energy Law in Poland Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Project Meeting, 3rd October 2013 Kraków

20 Planned legislation history Draft acts on RES announced within last 2 years Introducing GC coefficients for new installations: SHP < 75 kw feed-in tariffs suggested price 0,7 PLN/kWh 75 kw <SHP < 1 MW from 1,6 in 2013 to 1,53 in MW <SHP < 10 MW from 1,7 in 2013 to 1,62 in MW<HP < 20 MW from 2,3 in 2013 r. to 2,15 in 2017 r. Lack of support (Green Certificates) for installations operating for more then 15 years; Lack of the obligation of purchase of energy from installations operating for more then 15 years; Modernisation regaining the support proportionally to the increase of capacity; Reduction of income by around 2/3 (GC) for older installations may lead to gradual liquidation of about hydropower plants.

21 In actual fact as of today The Act of 26 July 2013 amending the Act - Energy Law and other laws Implements the Directive 2009/28/WE on the promotion of the use of energy from renewable sources (solves the problem of lawsuit against Poland in the European Court of Justice) Changes for RES producers: -introduces guarantees of origin; -defines microinstallations (up to 40 kw) which are paid 80% of the energy price guaranteed for RES).

22 In actual fact as of today The draft of optimised support schemes for producers of electricity from renewable sources and farm biogas presented by the Ministry of Economy on 17th September 2013

23 In actual fact as of today The draft of optimised support schemes the range of optimisation 1. Retaining the present support schemes for existing RES instalations (for 15 years from obtaining first green certificates by an instalation but maximum until 31 December 2021); 2. New solutions for existing plants as an alternative to the present system; 3. Introducing the new system of Dutch auctions for new and refurbished instalations; 4. Introducing solutions for the developent of prosument energy allowing fulfilling self needs by energy consumers.

24 In actual fact as of today The draft of optimised support schemes remarks from hydropower sector In case of refurbishment the regained support is proportional to the increase of capacity (impracticable in case of hydropower planst) Liquidation of support for existing hydropower plants above 1 MW The penalty fee paid by the energy suppliers in case of not fulfilling the quota of green cerificates while providing electricity to customers will be frosen at the present so the prices of green certificates will be frosen and their real value will decrease; The same price of support resulting from auctions for 15 years without including infation; Problems with predeclaring the energy generation Complicated procedures in case of changing from the old system to the new one; Problems with accesability of the system for investors etc.

25 Current support schemes for SHP The present support schemes for RES instalations: Guaranteed price of energy + Green Certificates included in the Energy Law equal to all RES minimum guaranteed price for energy from RES = 50 Green Certificates (property rights resulting from the certificates of origin) 1 MWh = 1 Green Certificate = Approx Novelty: the fee for balancing of the grid deducted from the energy price = approx. 3-4/MWh length 15 years from obtaining first green certificates by the instalation, max 31 December 2021???

26 Thank you!

Warunki korzystania z wód regionów wodnych i Nowe Prawo Wodne

Warunki korzystania z wód regionów wodnych i Nowe Prawo Wodne Warunki korzystania z wód regionów wodnych i Nowe Prawo Wodne Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Spotkanie członków TRMEW Ślesin, 29-30 listopada 2013 1 Czym są warunki korzystania

Bardziej szczegółowo

Małe elektrownie wodne na rzece Myśli jako przykład hydroenergetycznego wykorzystania istniejących stopni wodnych

Małe elektrownie wodne na rzece Myśli jako przykład hydroenergetycznego wykorzystania istniejących stopni wodnych Małe elektrownie wodne na rzece Myśli jako przykład hydroenergetycznego wykorzystania istniejących stopni wodnych Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych VII Konferencja Odnawialne źródła

Bardziej szczegółowo

REHABILITATION OF MEDIUM-HEAD HYDROPOWER PLANTS WITH EXPLOITED TWIN-FRANCIS TURBINES.

REHABILITATION OF MEDIUM-HEAD HYDROPOWER PLANTS WITH EXPLOITED TWIN-FRANCIS TURBINES. ZRE Gdańsk S.A. ul. Litewska 14A 80-719 Gdańsk REHABILITATION OF MEDIUM-HEAD HYDROPOWER PLANTS WITH EXPLOITED TWIN-FRANCIS TURBINES. Maciej Kaniecki, PhD Andrzej Łojek, PhD Marusz Hajdarowicz, M.Sc.Eng

Bardziej szczegółowo

WYKORZYSTANIE HYDROENERGETYCZNE istniejących obiektów piętrzących wodę w Polsce

WYKORZYSTANIE HYDROENERGETYCZNE istniejących obiektów piętrzących wodę w Polsce WYKORZYSTANIE HYDROENERGETYCZNE istniejących obiektów piętrzących wodę w Polsce Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Praktyczne aspekty inwestycji w zieloną energię, RENEXPO Poland,

Bardziej szczegółowo

GLOBAL METHANE INITIATIVE PARTNERSHIP-WIDE MEETING 12-14.10.2011 Kraków, Poland

GLOBAL METHANE INITIATIVE PARTNERSHIP-WIDE MEETING 12-14.10.2011 Kraków, Poland GLOBAL METHANE INITIATIVE PARTNERSHIP-WIDE MEETING 12-14.10.2011 Kraków, Poland INSTITUTE OF TECHNOLOGY AND LIVE SCIENCES POZNAŃ BRANCH Department of Environmental Management in Livestock Buildings and

Bardziej szczegółowo

Extraclass. Football Men. Season 2009/10 - Autumn round

Extraclass. Football Men. Season 2009/10 - Autumn round Extraclass Football Men Season 2009/10 - Autumn round Invitation Dear All, On the date of 29th July starts the new season of Polish Extraclass. There will be live coverage form all the matches on Canal+

Bardziej szczegółowo

PORTS AS LOGISTICS CENTERS FOR CONSTRUCTION AND OPERATION OF THE OFFSHORE WIND FARMS - CASE OF SASSNITZ

PORTS AS LOGISTICS CENTERS FOR CONSTRUCTION AND OPERATION OF THE OFFSHORE WIND FARMS - CASE OF SASSNITZ Part-financed by EU South Baltic Programme w w w. p t m e w. p l PROSPECTS OF THE OFFSHORE WIND ENERGY DEVELOPMENT IN POLAND - OFFSHORE WIND INDUSTRY IN THE COASTAL CITIES AND PORT AREAS PORTS AS LOGISTICS

Bardziej szczegółowo

Susza z 2015 r. ocena zjawiska i jego skutków. Jak przeciwdziałać skutkom suszy? Warszawa, 24 lutego 2016 r.

Susza z 2015 r. ocena zjawiska i jego skutków. Jak przeciwdziałać skutkom suszy? Warszawa, 24 lutego 2016 r. Susza z 2015 r. ocena zjawiska i jego skutków. Jak przeciwdziałać skutkom suszy? Warszawa, 24 lutego 2016 r. Małe elektrownie wodne jako element tworzenia małej retencji i zapobiegania skutkom suszy Ewa

Bardziej szczegółowo

Udostępnianie nowych stopni wodnych pod elektrownie wodne. Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych

Udostępnianie nowych stopni wodnych pod elektrownie wodne. Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Udostępnianie nowych stopni wodnych pod elektrownie wodne Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych KRAJOWY PLAN DZIAŁANIA W ZAKRESIE ENERGII ZE ŹRÓDEŁ ODNAWIALNYCH Uzupełnienie do Krajowego

Bardziej szczegółowo

Implementation of the JEREMIE initiative in Poland. Prague, 8 November 2011

Implementation of the JEREMIE initiative in Poland. Prague, 8 November 2011 Implementation of the JEREMIE initiative in Poland Prague, 8 November 2011 Poland - main beneficiary of EU structural funds - 20% of allocation within cohesion policy (EUR 67 bln) Over EUR 10 bln of NSRF

Bardziej szczegółowo

Legal framework of electric vehicles business in Poland. Otoczenie prawne dla biznesu EV w Polsce

Legal framework of electric vehicles business in Poland. Otoczenie prawne dla biznesu EV w Polsce 1 Legal framework of electric vehicles business in Poland Otoczenie prawne dla biznesu EV w Polsce 2 Czego się dowiesz? / What you'll learn? Samochody elektryczne w świetle prawa polskiego / EV under Polish

Bardziej szczegółowo

KATOWICE SPECIAL ECONOMIC ZONE GLIWICE SUBZONE and its influence on local economy KATOWICE SPECIAL ECONOMIC ZONE - GLIWICE SUBZONE

KATOWICE SPECIAL ECONOMIC ZONE GLIWICE SUBZONE and its influence on local economy KATOWICE SPECIAL ECONOMIC ZONE - GLIWICE SUBZONE KATOWICE SPECIAL ECONOMIC ZONE GLIWICE SUBZONE and its influence on local economy Definition: WHAT DOES THE SPECIAL ECONOMIC ZONE MEAN? THE SPECIAL ECONOMIC ZONE IS THE SEPERATED AREA WITH ATTRACTIVE TAX

Bardziej szczegółowo

Oceny oddziaływania na stan wód w rozumieniu RDW, a inne instrumenty oceny oddziaływania na środowisko

Oceny oddziaływania na stan wód w rozumieniu RDW, a inne instrumenty oceny oddziaływania na środowisko Oceny oddziaływania na stan wód w rozumieniu RDW, a inne instrumenty oceny oddziaływania na środowisko Assessment of impact on the state of waters in the meaning of WFD and other instruments of environmental

Bardziej szczegółowo

EXPERIENCE OF ŁUBIANKA

EXPERIENCE OF ŁUBIANKA EXPERIENCE OF ŁUBIANKA COMMUNE 1 2 SUSTAINABLE ENERGY ACTION PLAN REDUCTION OF CO 2 PROMOTION OF RES ENERGY EFFICIENCY IMPROVEMENT MOBILIZATION OF LOCAL POPULATION 3 REDUCTION OF CO 2 (PLAN 5X20) Of min

Bardziej szczegółowo

POLISH ELEVATOR MARKET ONE YEAR AFTER JOINING EU

POLISH ELEVATOR MARKET ONE YEAR AFTER JOINING EU POLISH ELEVATOR MARKET ONE YEAR AFTER JOINING EU by Marek Oppeln-Bronikowski, 17 of March 2005, Brussels POLISH ECONOMICAL SITUATION POLISH ECONOMICAL SITUATION REAL ECONOMY: YEAR GDP CPI year-end Investment

Bardziej szczegółowo

Fotowoltaika w Polsce. PVGRID National Forum Warsaw, 06.06.2013 Stanislaw M. Pietruszko Polskie Towarzystwo Fotowoltaiki

Fotowoltaika w Polsce. PVGRID National Forum Warsaw, 06.06.2013 Stanislaw M. Pietruszko Polskie Towarzystwo Fotowoltaiki Fotowoltaika w Polsce PVGRID National Forum Warsaw, 06.06.2013 Stanislaw M. Pietruszko Polskie Towarzystwo Fotowoltaiki 1 Napromieniowanie słoneczne a zasoby naturalne 8 x 10 8 TWh 1 x 10 5 TWh 8000 razy

Bardziej szczegółowo

PL-DE data test case. Kamil Rybka. Helsinki, November 2017

PL-DE data test case. Kamil Rybka. Helsinki, November 2017 PL-DE data test case Kamil Rybka Helsinki, 13-14 November 2017 1 1 st step PL Data mapping 2 1 st step PL Data mapping PL Kod mspdata sztuczne wyspy, konstrukcje i urządzenia W other-islands transport

Bardziej szczegółowo

Woda Środowisko Obszary Wiejskie. Rozprawy naukowe i monografie nr 34. Marcin Bukowski

Woda Środowisko Obszary Wiejskie. Rozprawy naukowe i monografie nr 34. Marcin Bukowski Woda Środowisko Obszary Wiejskie. Rozprawy naukowe i monografie nr 34 Marcin Bukowski EFEKTYWNOŚĆ EKONOMICZNA PRODUKCJI ENERGII W MAŁYCH ELEKTROWNIACH WODNYCH ECONOMIC EFFICIENCY OF ENERGY PRODUCTION IN

Bardziej szczegółowo

Perspectives of photovoltaics in Poland

Perspectives of photovoltaics in Poland Perspectives of photovoltaics in Poland Stanisław M. Pietruszko Polish Society for Photovoltaics Warsaw University of Technology PV power installed in Poland Year Capacity [MW] No of systems Yearly growth

Bardziej szczegółowo

Domy inaczej pomyślane A different type of housing CEZARY SANKOWSKI

Domy inaczej pomyślane A different type of housing CEZARY SANKOWSKI Domy inaczej pomyślane A different type of housing CEZARY SANKOWSKI O tym, dlaczego warto budować pasywnie, komu budownictwo pasywne się opłaca, a kto się go boi, z architektem, Cezarym Sankowskim, rozmawia

Bardziej szczegółowo

Network Services for Spatial Data in European Geo-Portals and their Compliance with ISO and OGC Standards

Network Services for Spatial Data in European Geo-Portals and their Compliance with ISO and OGC Standards INSPIRE Conference 2010 INSPIRE as a Framework for Cooperation Network Services for Spatial Data in European Geo-Portals and their Compliance with ISO and OGC Standards Elżbieta Bielecka Agnieszka Zwirowicz

Bardziej szczegółowo

Current state of biogas production in Poland

Current state of biogas production in Poland Aktualna sytuacja produkcji biogazu w Polsce Current state of biogas production in Poland Magdalena Papajewska Project Development Manager 30-05-2012 Kraków BIOGAS IN POLAND Region of Poland Wastewater

Bardziej szczegółowo

Innowacyjna technologia instalacji turbin wiatrowych z zastosowaniem

Innowacyjna technologia instalacji turbin wiatrowych z zastosowaniem Innowacyjna technologia instalacji turbin wiatrowych z zastosowaniem Ŝurawia GTK1100 Poznań, 24-11-2010 Igor Pawela Forum Czystej Energii Innowacyjna technologia instalacji turbin wiatrowych z zastosowaniem

Bardziej szczegółowo

Unit of Social Gerontology, Institute of Labour and Social Studies ageing and its consequences for society

Unit of Social Gerontology, Institute of Labour and Social Studies ageing and its consequences for society Prof. Piotr Bledowski, Ph.D. Institute of Social Economy, Warsaw School of Economics local policy, social security, labour market Unit of Social Gerontology, Institute of Labour and Social Studies ageing

Bardziej szczegółowo

Organic plant breeding: EU legal framework and legislative challenges Ekologiczna hodowla roślin: ramy prawne UE i wyzwania legislacyjne

Organic plant breeding: EU legal framework and legislative challenges Ekologiczna hodowla roślin: ramy prawne UE i wyzwania legislacyjne Organic plant breeding: EU legal framework and legislative challenges Ekologiczna hodowla roślin: ramy prawne UE i wyzwania legislacyjne Antje Kölling IFOAM EU Policy Manager EkoSeedForum 20-22 March 2014

Bardziej szczegółowo

Sargent Opens Sonairte Farmers' Market

Sargent Opens Sonairte Farmers' Market Sargent Opens Sonairte Farmers' Market 31 March, 2008 1V8VIZSV7EVKIRX8(1MRMWXIVSJ7XEXIEXXLI(ITEVXQIRXSJ%KVMGYPXYVI *MWLIVMIWERH*SSHTIVJSVQIHXLISJJMGMEPSTIRMRKSJXLI7SREMVXI*EVQIVW 1EVOIXMR0E]XS[R'S1IEXL

Bardziej szczegółowo

Financial support for start-uppres. Where to get money? - Equity. - Credit. - Local Labor Office - Six times the national average wage (22000 zł)

Financial support for start-uppres. Where to get money? - Equity. - Credit. - Local Labor Office - Six times the national average wage (22000 zł) Financial support for start-uppres Where to get money? - Equity - Credit - Local Labor Office - Six times the national average wage (22000 zł) - only for unymployed people - the company must operate minimum

Bardziej szczegółowo

Economic Survey 2018 Poland in the eyes of foreign investors

Economic Survey 2018 Poland in the eyes of foreign investors Poland in the eyes of foreign investors International Group of Chambers of Commerce in Poland Part I Characteristics of the surveyed companies Structure of respondents - branches. Supply 2,0% Branches

Bardziej szczegółowo

Health Resorts Pearls of Eastern Europe Innovative Cluster Health and Tourism

Health Resorts Pearls of Eastern Europe Innovative Cluster Health and Tourism Health Resorts Pearls of Eastern Europe Innovative Cluster Health and Tourism Projekt finansowany Fundusze Europejskie z budżetu państwa dla rozwoju oraz ze Polski środków Wschodniej Unii Europejskiej

Bardziej szczegółowo

Economic Survey 2018 Poland in the eyes of foreign investors

Economic Survey 2018 Poland in the eyes of foreign investors Poland in the eyes of foreign investors International Group of Chambers of Commerce in Poland Part I Characteristics of the surveyed companies Structure of respondents - branches. Supply 2,0% Branches

Bardziej szczegółowo

Czyste energie. Sposoby rozliczeń za energię elektryczną produkowaną w instalacjach fotowoltaicznych. wykład 6. dr inż.

Czyste energie. Sposoby rozliczeń za energię elektryczną produkowaną w instalacjach fotowoltaicznych. wykład 6. dr inż. Czyste energie wykład 6 Sposoby rozliczeń za energię elektryczną produkowaną w instalacjach fotowoltaicznych dr inż. Janusz Teneta Wydział EAIiE Katedra Automatyki AGH Kraków 2010 Odnawialne źródła energii

Bardziej szczegółowo

Biogasplant in Poldanor

Biogasplant in Poldanor 1 Biogasplant in Poldanor 2 Biogas plant in Poldanor Lp. Biogas plant Location Start Installation capacity [kwe/kwt] 1. Pawłówko Powiat człuchowski, gmina Przechlewo 2005-06-09 946/1004 2. Płaszczyca Powiat

Bardziej szczegółowo

www.irs.gov/form990. If "Yes," complete Schedule A Schedule B, Schedule of Contributors If "Yes," complete Schedule C, Part I If "Yes," complete Schedule C, Part II If "Yes," complete Schedule C, Part

Bardziej szczegółowo

1987-2012 DYSKRET POLSKA 1987-2014

1987-2012 DYSKRET POLSKA 1987-2014 25 LAT 27 LAT 1987-2012 DYSKRET POLSKA 1987-2014 nasi klienci dobrze trafili... get your swing on with us... www.dyskret.com.pl 30-023 Kraków, ul. Mazowiecka 131 tel. +48 12 423 31 00, office@dyskret.com.pl

Bardziej szczegółowo

SUPPLEMENTARY INFORMATION FOR THE LEASE LIMIT APPLICATION

SUPPLEMENTARY INFORMATION FOR THE LEASE LIMIT APPLICATION SUPPLEMENTARY INFORMATION FOR THE LEASE LIMIT APPLICATION 1. Applicant s data Company s name (address, phone) NIP (VAT) and REGON numbers Contact person 2. PPROPERTIES HELD Address Type of property Property

Bardziej szczegółowo

Wykorzystanie hydroenergetyczne istniejących obiektów piętrzących wodę w Polsce.

Wykorzystanie hydroenergetyczne istniejących obiektów piętrzących wodę w Polsce. Wykorzystanie hydroenergetyczne istniejących obiektów piętrzących wodę w Polsce. Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Praktyczne aspekty inwestycji w zieloną energię, RENEXPO Poland,

Bardziej szczegółowo

MAŁE ELEKTROWNIE WODNE W SYSTEMIE PLANOWANIA PRZESTRZENNEGO W POLSCE

MAŁE ELEKTROWNIE WODNE W SYSTEMIE PLANOWANIA PRZESTRZENNEGO W POLSCE Anita Bernatek 1 MAŁE ELEKTROWNIE WODNE W SYSTEMIE PLANOWANIA PRZESTRZENNEGO W POLSCE Streszczenie. Małe elektrownie wodne są obecne w systemie planowania przestrzennego w Polsce. Na szczeblu krajowym

Bardziej szczegółowo

Has the heat wave frequency or intensity changed in Poland since 1950?

Has the heat wave frequency or intensity changed in Poland since 1950? Has the heat wave frequency or intensity changed in Poland since 1950? Joanna Wibig Department of Meteorology and Climatology, University of Lodz, Poland OUTLINE: Motivation Data Heat wave frequency measures

Bardziej szczegółowo

THE INVESTMENT AREAS - BYTOM, LEŚNA STREET TERENY INWESTYCYJNE - BYTOM, ULICA LEŚNA

THE INVESTMENT AREAS - BYTOM, LEŚNA STREET TERENY INWESTYCYJNE - BYTOM, ULICA LEŚNA TERENY INWESTYCYJNE - BYTOM, ULICA LEŚNA Atrakcyjne tereny inwestycyjne znajdują się przy ul. Leśnej w Bytomiu, w bezpośrednim sąsiedztwie Alei Jana Nowaka-Jeziorańskiego. Przeznaczona do sprzedaży uzbrojona

Bardziej szczegółowo

Installation of EuroCert software for qualified electronic signature

Installation of EuroCert software for qualified electronic signature Installation of EuroCert software for qualified electronic signature for Microsoft Windows systems Warsaw 28.08.2019 Content 1. Downloading and running the software for the e-signature... 3 a) Installer

Bardziej szczegółowo

System optymalizacji produkcji energii

System optymalizacji produkcji energii System optymalizacji produkcji energii Produkcja energii jest skomplikowanym procesem na który wpływa wiele czynników, optymalizacja jest niezbędna, bieżąca informacja o kosztach i możliwościach wykorzystania

Bardziej szczegółowo

Effective Governance of Education at the Local Level

Effective Governance of Education at the Local Level Effective Governance of Education at the Local Level Opening presentation at joint Polish Ministry OECD conference April 16, 2012, Warsaw Mirosław Sielatycki Ministry of National Education Doskonalenie

Bardziej szczegółowo

Country fact sheet. Noise in Europe overview of policy-related data. Poland

Country fact sheet. Noise in Europe overview of policy-related data. Poland Country fact sheet Noise in Europe 2015 overview of policy-related data Poland April 2016 The Environmental Noise Directive (END) requires EU Member States to assess exposure to noise from key transport

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Informacje dotyczące nieruchomości Property information Charakterystyka działki Land specification Nazwa lokalizacji Site name Miasto / Gmina

Bardziej szczegółowo

EN/PL COUNCIL OF THE EUROPEAN UNION. Brussels, 25 March 2014. 8148/14 Interinstitutional File: 2014/0011 (COD)

EN/PL COUNCIL OF THE EUROPEAN UNION. Brussels, 25 March 2014. 8148/14 Interinstitutional File: 2014/0011 (COD) COUNCIL OF THE EUROPEAN UNION Brussels, 25 March 2014 8148/14 Interinstitutional File: 2014/0011 (COD) CLIMA 30 ENV 318 MI 307 IND 117 ENER 142 ECOFIN 305 TRANS 175 COMPET 191 CODEC 893 INST 173 PARLNAT

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Informacje dotyczące nieruchomości Property information Charakterystyka działki Land specification

Bardziej szczegółowo

1. INFORMACJE OGÓLNE

1. INFORMACJE OGÓLNE 1 1. INFORMACJE OGÓLNE 1.1 Cel Zapytania Ofertowego Celem niniejszego Zapytania Ofertowego jest wybranie Firmy w Konkursie Ofert na dostawę: Drążarki wgłębnej CNC. 1.2 Zakres oferty Państwa propozycja

Bardziej szczegółowo

Space for your logo, a photograph etc. Action 3.3.1 (WBU) www.viaregiaplus.eu

Space for your logo, a photograph etc. Action 3.3.1 (WBU) www.viaregiaplus.eu Space for your logo, a photograph etc. Action 3.3.1 (WBU) THE ANALYSIS CONCERNING THE DESIGNATION OF THE ROUTE THAT INTEGRATES THE SOUTH OF THE LOWER SILESIA PROVINCE TOGETHER WITH NORTH - SOUTHLINKS Analiza

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Cena Price Informacje dotyczące nieruchomości Property information Charakterystyka działki

Bardziej szczegółowo

Final LCP TWG meeting, 1-9.06 Sewilla

Final LCP TWG meeting, 1-9.06 Sewilla Final LCP TWG meeting, 1-9.06 Sewilla nieformalne podsumowanie Warszawa, 19.05.2015 r. Schedule Day 1 Monday, 1 st June 2015 Day 2 Tuesday, 2 nd June 2015 Day 3 Wednesday, 3 rd June 2015 Day 4 Thrusday,

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DAYCH DOTYCZĄCYCH TEREU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Cena Price Informacje dotyczące nieruchomości Property information Charakterystyka działki Land

Bardziej szczegółowo

shale gas do economics and regulation change at the German-Polish border Pawe Poprawa Polish Geological Institute BSEC, Berlin,

shale gas do economics and regulation change at the German-Polish border Pawe Poprawa Polish Geological Institute BSEC, Berlin, shale gas do economics and regulation change at the German-Polish border Pawe Poprawa Polish Geological Institute BSEC, Berlin, 01.12.20011 North America gas shale basins increase of shale gas supply to

Bardziej szczegółowo

The shape of and the challenges for the Polish EO sector initial findings of the SEED EO project

The shape of and the challenges for the Polish EO sector initial findings of the SEED EO project The shape of and the challenges for the Polish EO sector initial findings of the SEED EO project Drugie Forum Obserwacji Ziemi Ministerstwo Rozwoju Warszawa, 4 lipca 2016 2 Zadania projektu Stworzenie

Bardziej szczegółowo

Projekt realizowany przez: Regionalny Zarząd Gospodarki Wodnej w Krakowie we współpracy z Regionalną Dyrekcją Ochrony Środowiska w Krakowie

Projekt realizowany przez: Regionalny Zarząd Gospodarki Wodnej w Krakowie we współpracy z Regionalną Dyrekcją Ochrony Środowiska w Krakowie Warunki zarządzania obszarem dorzecza i ochroną różnorodności biologicznej dla zapewnienia zrównoważonego rozwoju obszarów cennych przyrodniczo na przykładzie zlewni Czarnej Orawy stanowiącej część transgranicznego

Bardziej szczegółowo

Warunki korzystania z wód regionu wodnego

Warunki korzystania z wód regionu wodnego Warunki korzystania z wód regionu wodnego Warunki korzystania z wód - regulacje prawne art. 113 ust. 1 ustawy Prawo wodne Planowanie w gospodarowaniu wodami obejmuje następujące dokumenty planistyczne:

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Nazwa lokalizacji Site name Miasto / Gmina Town / Commune Powiat District Województwo Province

Bardziej szczegółowo

PRODUCTION HALL OFFER

PRODUCTION HALL OFFER PRODUCTION HALL OFFER 1. Name of production hall / Nazwa hali produkcyjnej Bałtowska 2. Location / Lokalizacja PRODUCTION HALL DATA Town / Street Miasto / Ulica Ostrowiec Świętokrzyski/Bałtowska Street

Bardziej szczegółowo

Rozwój przemysłu w obszarze Delty Wisły Międzynarodowa Konferencja Deltanet Delta Awareness

Rozwój przemysłu w obszarze Delty Wisły Międzynarodowa Konferencja Deltanet Delta Awareness Rozwój przemysłu w obszarze Delty Wisły Międzynarodowa Konferencja Deltanet Delta Awareness Economic Development in the Vistula Delta International Conference Deltanet - "Delta Awareness Leszek Miazga

Bardziej szczegółowo

www.irs.gov/form990. If "Yes," complete Schedule A Schedule B, Schedule of Contributors If "Yes," complete Schedule C, Part I If "Yes," complete Schedule C, Part II If "Yes," complete Schedule C, Part

Bardziej szczegółowo

Czarnków Kompleks 3 / Czarnków Complex 3

Czarnków Kompleks 3 / Czarnków Complex 3 Położenie / Location Skrócona nazwa Czarnków Kompleks 3 Short name Czarnków Complex 3 Miasto/gmina Romanowo Dolne Town/commune Romanowo Dolne Powiat czarnkowsko-trzcianecki District czarnkowsko-trzcianecki

Bardziej szczegółowo

Adam Kozierkiewicz JASPERS

Adam Kozierkiewicz JASPERS Adam Kozierkiewicz JASPERS Europa 2020 Flagship initiatives Priorities Targets Digital agenda for Europe Innovation Union Youth on the move Resource efficient Europe An industrial policy for the globalisation

Bardziej szczegółowo

RESTOR Hydro podsumowanie pierwszego roku realizacji projektu

RESTOR Hydro podsumowanie pierwszego roku realizacji projektu RESTOR Hydro podsumowanie pierwszego roku realizacji projektu Ewa Malicka Towarzystwo Rozwoju Małych Elektrowni Wodnych Dziś i jutro energetyki wodnej w Polsce i w Europie, RENEXPO Poland, Warszawa, 16

Bardziej szczegółowo

Warunki korzystania z wód regionu wodnego Dolnej Wisły

Warunki korzystania z wód regionu wodnego Dolnej Wisły Warunki korzystania z wód regionu wodnego Dolnej Wisły Joanna Jamka-Szymaoska Regionalny Zarząd Gospodarki Wodnej w Gdaosku Gdynia 13.10.2016r. Ważny dokument planistyczny w planowaniu gospodarowania wodami

Bardziej szczegółowo

Warunki korzystania z wód jako narzędzie wdrożenia planu gospodarowania wodami w obszarze dorzecza

Warunki korzystania z wód jako narzędzie wdrożenia planu gospodarowania wodami w obszarze dorzecza Warunki korzystania z wód jako narzędzie wdrożenia planu gospodarowania wodami w obszarze dorzecza Warunki korzystania z wód - regulacje prawne art. 125 ustawy Prawo wodne Pozwolenie wodnoprawne nie może

Bardziej szczegółowo

Helena Boguta, klasa 8W, rok szkolny 2018/2019

Helena Boguta, klasa 8W, rok szkolny 2018/2019 Poniższy zbiór zadań został wykonany w ramach projektu Mazowiecki program stypendialny dla uczniów szczególnie uzdolnionych - najlepsza inwestycja w człowieka w roku szkolnym 2018/2019. Składają się na

Bardziej szczegółowo

SSW1.1, HFW Fry #20, Zeno #25 Benchmark: Qtr.1. Fry #65, Zeno #67. like

SSW1.1, HFW Fry #20, Zeno #25 Benchmark: Qtr.1. Fry #65, Zeno #67. like SSW1.1, HFW Fry #20, Zeno #25 Benchmark: Qtr.1 I SSW1.1, HFW Fry #65, Zeno #67 Benchmark: Qtr.1 like SSW1.2, HFW Fry #47, Zeno #59 Benchmark: Qtr.1 do SSW1.2, HFW Fry #5, Zeno #4 Benchmark: Qtr.1 to SSW1.2,

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DACH DOTCZĄCCH TEREU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property azwa lokalizacji Site name Miasto / Gmina Town / Commune Powiat District Województwo Province (Voivodship)

Bardziej szczegółowo

CO NOWEGO NA RYNKU ENERGII ODNAWIALNEJ? WHAT'S NEW ON THE RENEWABLE ENERGY MARKET?

CO NOWEGO NA RYNKU ENERGII ODNAWIALNEJ? WHAT'S NEW ON THE RENEWABLE ENERGY MARKET? Briefing note Luty 2013 CO NOWEGO NA RYNKU ENERGII ODNAWIALNEJ? WHAT'S NEW ON THE RENEWABLE ENERGY MARKET? Prace legislacyjne nad Dużym Trójpakiem Polski sektor energetyki odnawialnej wciąż czeka na ostateczną

Bardziej szczegółowo

European Crime Prevention Award (ECPA) Annex I - new version 2014

European Crime Prevention Award (ECPA) Annex I - new version 2014 European Crime Prevention Award (ECPA) Annex I - new version 2014 Załącznik nr 1 General information (Informacje ogólne) 1. Please specify your country. (Kraj pochodzenia:) 2. Is this your country s ECPA

Bardziej szczegółowo

Awareness campaign Safe rail-road level crossing "Stop and Live!"

Awareness campaign Safe rail-road level crossing Stop and Live! Awareness campaign Safe rail-road level crossing "Stop and Live!" www.plk-sa.pl Geneva, 12-13 May 2014 The key objective of the campaign is: What are our objectives? - to promote the correct patterns of

Bardziej szczegółowo

ZGŁOSZENIE WSPÓLNEGO POLSKO -. PROJEKTU NA LATA: APPLICATION FOR A JOINT POLISH -... PROJECT FOR THE YEARS:.

ZGŁOSZENIE WSPÓLNEGO POLSKO -. PROJEKTU NA LATA: APPLICATION FOR A JOINT POLISH -... PROJECT FOR THE YEARS:. ZGŁOSZENIE WSPÓLNEGO POLSKO -. PROJEKTU NA LATA: APPLICATION FOR A JOINT POLISH -... PROJECT FOR THE YEARS:. W RAMACH POROZUMIENIA O WSPÓŁPRACY NAUKOWEJ MIĘDZY POLSKĄ AKADEMIĄ NAUK I... UNDER THE AGREEMENT

Bardziej szczegółowo

Council of the European Union Brussels, 7 April 2016 (OR. en, pl)

Council of the European Union Brussels, 7 April 2016 (OR. en, pl) Council of the European Union Brussels, 7 April 2016 (OR. en, pl) Interinstitutional File: 2015/0310 (COD) 7433/16 COVER NOTE From: Polish Senate date of receipt: 17 March 2016 To: Subject: General Secretariat

Bardziej szczegółowo

Current Report No. 14/2012 Wysogotowo, March 16th 2012

Current Report No. 14/2012 Wysogotowo, March 16th 2012 Current Report No. 14/2012 Wysogotowo, March 16th 2012 Subject: Notification of decrease in Pioneer Pekao Investment Management S.A. s holding of PBG shares The Management Board of hereby reports that

Bardziej szczegółowo

Beata Maciąg Board Member Grzegorz Latała - Board Member

Beata Maciąg Board Member Grzegorz Latała - Board Member MERGER PLAN of Mayland Real Estate limited liability company with its registered office in Warsaw and Espace Gdańsk limited liability company with its registered office in Warsaw Pursuant to the provisions

Bardziej szczegółowo

Revenue Maximization. Sept. 25, 2018

Revenue Maximization. Sept. 25, 2018 Revenue Maximization Sept. 25, 2018 Goal So Far: Ideal Auctions Dominant-Strategy Incentive Compatible (DSIC) b i = v i is a dominant strategy u i 0 x is welfare-maximizing x and p run in polynomial time

Bardziej szczegółowo

Economical utilization of coal bed methane emitted during exploitation of coal seams energetic and environmental aspects

Economical utilization of coal bed methane emitted during exploitation of coal seams energetic and environmental aspects Economical utilization of coal bed methane emitted during exploitation of coal seams energetic and environmental aspects President of The Board mgr inż. Roman Łój Katowicki Holding Węglowy S.A. Katowicki

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DAYCH DOTYCZĄCYCH TEREU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property azwa lokalizacji Site name Miasto / Gmina Town / Commune Powiat District Województwo Province

Bardziej szczegółowo

SUPPLEMENTARY INFORMATION FOR THE LEASE LIMIT APPLICATION

SUPPLEMENTARY INFORMATION FOR THE LEASE LIMIT APPLICATION SUPPLEMENTARY INFORMATION FOR THE LEASE LIMIT APPLICATION 1. Applicant s data Company s name (address, phone) NIP (VAT) and REGON numbers Contact person 2. PPROPERTIES HELD Address Type of property Property

Bardziej szczegółowo

Incentives to promote the development of renewable energy in Poland

Incentives to promote the development of renewable energy in Poland www.ees.uni.opole.pl ISSN paper version 1642-2597 ISSN electronic version 2081-8319 Economic and Environmental Studies Vol. 14, No. 4 (32/2014), 427-439, Dec. 2014 Incentives to promote the development

Bardziej szczegółowo

Poland Tenders. Przebudowa budynku OSP Nowym Lublińcu z przeznaczeniem na świetlicę wiejską z zapleczem. Nazwa. Miejscowość.

Poland Tenders. Przebudowa budynku OSP Nowym Lublińcu z przeznaczeniem na świetlicę wiejską z zapleczem. Nazwa. Miejscowość. Poland Tenders Nazwa Przebudowa budynku OSP Nowym Lublińcu z przeznaczeniem na świetlicę wiejską z zapleczem Miejscowość Cieszanów Numer ogłoszenia 154129 Data zamieszczenia 2011-06-01 Typ ogłoszenia Ogłoszenie

Bardziej szczegółowo

A DIFFERENT APPROACH WHERE YOU NEED TO NAVIGATE IN THE CURRENT STREAMS AND MOVEMENTS WHICH ARE EMBEDDED IN THE CULTURE AND THE SOCIETY

A DIFFERENT APPROACH WHERE YOU NEED TO NAVIGATE IN THE CURRENT STREAMS AND MOVEMENTS WHICH ARE EMBEDDED IN THE CULTURE AND THE SOCIETY A DIFFERENT APPROACH WHERE YOU NEED TO NAVIGATE IN THE CURRENT STREAMS AND MOVEMENTS WHICH ARE EMBEDDED IN THE CULTURE AND THE SOCIETY ODMIENNE PODEJŚCIE JAK NAWIGOWAĆ W OBECNYCH NURTACH I RUCHACH, KTÓRE

Bardziej szczegółowo

VIII. Prawo budowlane określa podstawowe wymagania odnośnie projektu architektoniczno-budowalnego.

VIII. Prawo budowlane określa podstawowe wymagania odnośnie projektu architektoniczno-budowalnego. Wprowadzenie Ustawa z dnia 7 lipca 1994 r. Prawo budowlane (z późniejszymi zmianami), reguluje kwestie projektowania, budowy, utrzymania i rozbiórki obiektów budowlanych. Ustawa określa także zasady działania

Bardziej szczegółowo

SIŁA EKSPORTU POLSKIEJ BRANŻY KOSMETYCZNEJ

SIŁA EKSPORTU POLSKIEJ BRANŻY KOSMETYCZNEJ SIŁA EKSPORTU POLSKIEJ BRANŻY KOSMETYCZNEJ THE POWER OF EXPORT IN POLISH COSMETICS INDUSTRY KATARZYNA OLĘDZKA Brand Manager Verona Products Professional AGENDA 1. Branża kosmetyczna w Polsce i na świecie

Bardziej szczegółowo

ERASMUS + : Trail of extinct and active volcanoes, earthquakes through Europe. SURVEY TO STUDENTS.

ERASMUS + : Trail of extinct and active volcanoes, earthquakes through Europe. SURVEY TO STUDENTS. ERASMUS + : Trail of extinct and active volcanoes, earthquakes through Europe. SURVEY TO STUDENTS. Strona 1 1. Please give one answer. I am: Students involved in project 69% 18 Student not involved in

Bardziej szczegółowo

Twoje osobiste Obliczenie dla systemu ogrzewania i przygotowania c.w.u.

Twoje osobiste Obliczenie dla systemu ogrzewania i przygotowania c.w.u. Twoje osobiste Obliczenie dla systemu ogrzewania i przygotowania c.w.u. Wyłączenie odpowiedzialności This Erp calculation Tool is provided by Brötje. Access to and use of this Tool shall impose the following

Bardziej szczegółowo

EGARA 2011. Adam Małyszko FORS. POLAND - KRAKÓW 2-3 12 2011r

EGARA 2011. Adam Małyszko FORS. POLAND - KRAKÓW 2-3 12 2011r EGARA 2011 Adam Małyszko FORS POLAND - KRAKÓW 2-3 12 2011r HISTORIA ELV / HISTORY ELV 1992r. 5 Program działań na rzecz ochrony środowiska / EAP (Environmental Action Plan) 1994r. Strategia dobrowolnego

Bardziej szczegółowo

Patients price acceptance SELECTED FINDINGS

Patients price acceptance SELECTED FINDINGS Patients price acceptance SELECTED FINDINGS October 2015 Summary With growing economy and Poles benefiting from this growth, perception of prices changes - this is also true for pharmaceuticals It may

Bardziej szczegółowo

Analysis of Movie Profitability STAT 469 IN CLASS ANALYSIS #2

Analysis of Movie Profitability STAT 469 IN CLASS ANALYSIS #2 Analysis of Movie Profitability STAT 469 IN CLASS ANALYSIS #2 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

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DAYCH DOTYCZĄCYCH TEREU SITE CHECK LIST PODSTREFA OLECKO OLECKO SUBZOE Warmińsko Mazurska Specjalna Strefa Ekonomiczna iniejsza informacja nie stanowi oferty handlowej w rozumieniu art. 66 kodeksu

Bardziej szczegółowo

Privacy policy. Polityka prywatności. www.wochen-office.com. office@wochen-offce.com 0048 667-352-102 0048 501-059-473

Privacy policy. Polityka prywatności. www.wochen-office.com. office@wochen-offce.com 0048 667-352-102 0048 501-059-473 Privacy policy Polityka office@wochen-offce.com 0048 667-352-102 0048 501-059-473 registration / correspondence address: 05-850 Ożarów Mazowiecki ul. Dmowskiego 70A/37 Polska / Poland The personal / business

Bardziej szczegółowo

Bydgoszcz Kompleks 2 / Bydgoszcz Complex 2

Bydgoszcz Kompleks 2 / Bydgoszcz Complex 2 Położenie / Location Skrócona nazwa Bydgoszcz Kompleks 2 Short name Bydgoszcz Complex 2 Miasto/gmina Bydgoszcz Town/commune Bydgoszcz Powiat bydgoski District bydgoski Województwo Kujawsko-pomorskie Province(Voivodship)

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Nazwa lokalizacji Site name Boguchwała Miasto / Gmina Boguchwała Town / Commune Powiat Rzeszowski

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DAYCH DOTYCZĄCYCH TEREU SITE CHECK LIST PODSTREFA DOBRE MIASTO DOBRE MIASTO SUBZOE Investor ul. Barczewskiego 1, 10-061 Olsztyn tel/fax. +48 89 535 02 41 iniejsza informacja nie stanowi oferty handlowej

Bardziej szczegółowo

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST

LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST LISTA DANYCH DOTYCZĄCYCH TERENU SITE CHECK LIST Położenie Location Powierzchnia nieruchomości Area of property Informacje dotyczące nieruchomości Property information Charakterystyka działki Land specification

Bardziej szczegółowo

An employer s statement on the posting of a worker to the territory of the Republic of Poland

An employer s statement on the posting of a worker to the territory of the Republic of Poland Państwowa Inspekcja Pracy Annotation Główny Inspektorat Pracy ul. Barska 28/30 02-315 Warszawa Rzeczypospolita Polska Polska An employer s statement on the posting of a worker to the territory of the Republic

Bardziej szczegółowo

TYRE PYROLYSIS. REDUXCO GENERAL DISTRIBUTOR :: ::

TYRE PYROLYSIS. REDUXCO GENERAL DISTRIBUTOR  ::   :: TYRE PYROLYSIS Installation for rubber waste pyrolysis designed for processing of used tyres and plastic waste (polyethylene, polypropylene, polystyrene), where the final product could be electricity,

Bardziej szczegółowo

WYDZIAŁ NAUK EKONOMICZNYCH. Studia II stopnia niestacjonarne Kierunek Międzynarodowe Stosunki Gospodarcze Specjalność INERNATIONAL LOGISTICS

WYDZIAŁ NAUK EKONOMICZNYCH. Studia II stopnia niestacjonarne Kierunek Międzynarodowe Stosunki Gospodarcze Specjalność INERNATIONAL LOGISTICS Studia II stopnia niestacjonarne Kierunek Międzynarodowe Stosunki Gospodarcze Specjalność INERNATIONAL LOGISTICS Description Master Studies in International Logistics is the four-semesters studies, dedicate

Bardziej szczegółowo

MIL SUP 60/16 (MIL ENR 5) Obowiązuje od / Effective from 11 AUG 2016 Obowiązuje do / Effective to 15 AUG 2016

MIL SUP 60/16 (MIL ENR 5) Obowiązuje od / Effective from 11 AUG 2016 Obowiązuje do / Effective to 15 AUG 2016 POLSKA AGENCJA ŻEGLUGI POWIETRZNEJ SŁUŻBA INFORMACJI LOTNICZEJ 02-147 Warszawa, ul. Wieżowa 8 AIS HQ: +48-22-574-5610, Fax: +48-22-574-5619, AFS: EPWWYOYX NOTAM Office: +48-22-574-7174, Fax: +48-22-574-7179,

Bardziej szczegółowo