revision 1:20 PLAN 119 140 142 66 12 63 74 120 57 6 57 10 38 9 9 38 10 LAQUERED MDF RUBBER BLACK COATING DOOR FOR TECHNICAL INSPECTION in perforated steel for air circolation THE RIGHT HIGH AND SHAPE HAS TO BE VERIFIED AFTER FRAME MISUREMENT CHECKING LAQUERED MDF GLASS AREA TO LEAVE TRANSPARENT RUBBER COATING RFID ticket BENCH 78 66 142 12 63 10 tempered glass th= 5 mm, bevel 1 mm to be checked after test TOUCH FOIL sticked on the glass from inner side RUBBER BLACK COATING transparent area check the right dimension RFID ticket
11.10. 2017 revision 1:20 VERTICAL SECTION ORIZZONTAL SECTION SCHEME 34 36 30 74 8 spacer th=5 mm metal plat to fix screen EXISTING GLASS tempered glass th=5 mm bevel 1 mm to be checked after test TOUCH FOIL sticked on the glass from inner side SCREEN the distance from the glass has to be 5mm PLUG under the table MINI PC DOOR FOR TECHNICAL INSPECTION in perforated steel for air circolation MINI PC PLUG under the table DOOR FOR TECHNICAL INSPECTION in perforated steel for air circolation PLUG under the table
revision 1:20 PLAN EXISTING STRUCTURE AND BLUE GLASS EXISTING IRON STRUCTURE INSIDE
04.10.2017 revision 1:10 40 120 TO BE FIXED ON THE FLOOR ADJUSTABLE FEET 44 34 CUSHIONED TEXTILE BENCH
niche used for electrical cables revision 1:50 29.09. 2017
SŁOWNIK Strona 1 POZIOM -1 Skala 1:20 Angielski LAQUERED MDF RUBBER BLACK COATING RFID Polski ISTNIEJĄCA PŁYTA SZKLANA LAKIEROWANY MDF kolor do zdefiniowania SŁUCHAWKI GUMOWA CZARNA OKŁADZINA Bilet RFID Ticket DOOR FOR TECHNICAL INSPECTION In perforated steel for air circulation THE RIGHT HIGH AND SHAPE HAS TO BE VERIFIED AFTER MEASUREMENT CHECKING PLAN LAQUERED MDF GLASS AREA TO LEAVE TRANSPARENT RUBBER COATING BENCH DRZWICZKI DO INSPEKCJI TECHNICZNEJ Z perforowanej stali dla zapewnienia cyrkulacji powietrza WIDOK OD FRONTU WIDOK BOCZNY NALEŻY ZWERYFIKOWAĆ WŁAŚCIWĄ WYSOKOŚĆ I KSZTAŁT PO SPRAWDZENIU WYMIARÓW RZUT ISTNIEJĄCY PANEL SZKLANY LAKIEROWANY MDF OBSZAR TRANSPARENTNY SZKŁA GUMOWE WYKOŃCZENIE MALOWANE SZKŁO ŁAWKA
tempered glass th= 5 mm, bevel 1 mm to be checked after test TOUCH FOIL Sticked on the glass from the inner side RUBBER BLACK COATING TRANSPARENT AREA Check the right dimension ISTNIEJĄCY PANEL SZKLANY WIDOK BOCZNY MALOWANE SZKŁO Szkło hartowane gr = 5mm, faza 1mm Do sprawdzenia po przeprowadzeniu testów Kolor do zdefiniowania FOLIA DOTYKOWA Zamocowana po wewnętrznej stronie szkła WYKOŃCZENIE Z CZARNEJ GUMY SŁUCHAWKI OBSZAR TRANSPARENTNY Wymiary do sprawdzenia Strona 2 POZIOM -1 Skala 1:20 Angielski EXISTING GLASS tempered glass th= 5 mm, bevel 1 mm to be checked after test Spacer Th=5 mm TOUCH FOIL Sticked on the glass from inner side SCREEN The distance from the glass has to be 5 mm Polski ISTNIEJĄCE SZKŁO MALOWANE SZKŁO Szkło hartowane gr = 5mm, faza 1mm Do sprawdzenia po przeprowadzeniu testów Kolor do zdefiniowania PRZEKŁADKA DYSTANSUJĄCA GR=5 mm FOLIA DOTYKOWA Zamocowana po wewnętrznej stronie szkła EKRAN Odległość od szkła musi wynieść 5 mm
Metal plat to fix screen PLUG Under the table MINI PC DOOR FOR TECHNICAL INSPECTION In perforated steel for air circulation VERTICAL SECTION MINI PC PLUG Under the table DOOR FOR TECHNICAL INSPECTION In perforated steel for air circulation PLUG Under the table HORIZZONAL SECTION SCHEME Płytka metalowa do zamocowania ekranu WTYCZKA SŁUCHAWEK Pod blatem MINIKOMPUTER DRZWICZKI DO INSPEKCJI TECHNICZNEJ Z perforowanej stali dla zapewnienia cyrkulacji powietrza SEKCJA PIONOWA MINIKOMPUTER WTYCZKA SŁUCHAWEK Pod blatem DZRWICZKI DO INSPEKCJI TECHNICZNEJ Z perforowanej stali dla zapewnienia cyrkulacji powietrza WTYCZKA SŁUCHAWEK Pod blatem POZIOMY SCHEMAT SEKCJI Strona 3 POZIOM -1 Skala 1:20 Angielski EXISTING STRUCTURE AND BLUE GLASS PLAN EXISTING IRON STRUCTURE INSIDE Polski ISTNIEJĄCA KONSTRUKCJA I NIEBIESKA SZYBA ISTNIEJĄCY PANEL SZKLANY WIDOK OD FRONTU WIDOK BOCZNY RZUT ISTNIEJĄCA METALOWA KONSTRUKCJA WEWNĄTRZ
Strona 4 04.10.2017 POZIOM -1 Skala 1:10 Angielski CUSHIONED TEXTILE BENCH Colour to be define ADJUSTABLE FEET TO BE FIXED ON THE FLOOR Polski SIEDZISKO Z TAPICERKĄ MATERIAŁOWĄ Kolor do zdefiniowania WIDOK Z BOKU WIDOK Z PRZODU REGULOWANE NÓŻKI DO ZAMOCOWANIA NA PODŁODZE Strona 5 29.09.2017 POZIOM - 1 Skala 1:50